  • 1982 Putkimaa Oy established.
  • 1983 The first turnkey delivery of grate boiler plant using solid fuels.
  • 1985 The first turnkey delivery of fluidised bed plant using solid fuels.
  • 1996 The delivery of fluidised bed boiler to IVO International Oy in Russia.
  • 1999 The so far largest fluidised bed boiler (33 MW) using solid fuels delivered to Enso Group.
  • 2005 The first power plant (25 MW/56 bar) delivery to Koskisen Oy.
  • 2008 Pohjola Capital Partners Ltd acquired Putkimaa.